2024 China Supply Remote Control Heavy Duty Material Transfer Trolley
Product Description
Introduction of Heavy Duty Transfer Trolley
Our line of Industrial Transfer Cars are designed to accommodate the needs of a wide range of industries such as steel, aluminum, automotive, stamping, heavy manufacturing and several others. These units are designed to operate on floor mounted rails and are used to transport heavy materials across crane bays or in areas not serviced by an overhead crane.
Application
Application of Heavy Duty Transfer Trolley
The cable drum powered Heavy Duty Transfer Trolley is mainly applied in assembly line (ring production line, loop production line), metallurgy industry (steel ladle), warehouse transport, ship industry (maintenance, assemble, container transport), workpiece transport in workshop, lathe transport, steel factory (steel billet, steel plate, steel coil, steel pipe, section steel, steel structure), construction (bridge, simple building, concrete, concrete column), petroleum industry (oil pump, sucker rod and parts), energy (polycrystalline silicon, generator, windmill), chemical industry(electrolytic cell, retort etc), railway (rail maintenance, rail welding, train tractor).
Detailed Photos
Working Principle of Heavy Duty Transfer Trolley
This transfer cart get the power from the battery. The current is supplied to pulling motor through electric control system, which makes the car start, stop, move forward, turn around, change speed, etc. The transfer cart can run on curved rails and can use as ferry car. The battery powered transfer cart is suitable for all kinds of transport occasion since its travel distance is unlimited and low requirement to the track.
Features of Heavy Duty Transfer Trolley
1. Load up to 300t and high using frequency.
2. The running distance is unlimited.
3. With simple structure and low cost make it popular for workshop transportation.
4. The transfer cart can run on curved rails and can use as ferry car.
5. This Heavy Duty Transfer Trolley can be applied in the environment such as severe environment, high temperature, anti-explosive etc.
Product Parameters
Parameter of Heavy Duty Transfer Trolley
Model |
BXC-2t |
BXC-20t |
BXC-50t |
BXC-100t |
BXC-150t |
Rated Load(t) |
2 |
20 |
50 |
100 |
150 |
Table Size (mm) |
Length(L) |
2000 |
4000 |
5500 |
6500 |
10000 |
Width(W) |
1500 |
2200 |
2500 |
2800 |
3000 |
Height(H) |
450 |
550 |
650 |
900 |
1200 |
Wheel Base(mm) |
1200 |
2800 |
4200 |
4900 |
7000 |
Rail Inner Gauge(mm) |
1200 |
1435 |
1435 |
200 |
2000 |
Wheel Diameter (mm) |
270 |
350 |
500 |
600 |
600 |
Running Speed (m/min) |
0-25 |
0-20 |
0-20 |
0-20 |
0-18 |
Motor Power(kw) |
1 |
2.2 |
5 |
10 |
15 |
Battery Capacity |
180 |
180 |
330 |
440 |
600 |
Battery Voltage |
24 |
48 |
48 |
72 |
72 |
Running Time When Full Load |
4.32 |
4 |
3.3 |
3.2 |
2.9 |
Running Distance for One Charge(km) |
6.5 |
4.8 |
4 |
3.8 |
3.2 |
Recommended Rail Model |
P15 |
P24 |
P43 |
QU100 |
QU100 |
Machining Of Heavy Duty Transfer Trolley
CNC Cutting
Transport the steel plate from raw material warehouse to CNC cutting workshop for cutting. After the cutting, the workers will do some simple processing such as chip moving and setting out.
Preliminary Assembling
Put the cut steel plate together according to the design drawing
Welding
Weld the steel plate with automatic welding machine after the preliminary assembling
Post weld treatment
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint. The primer is to two layers
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.
Paint finish
Transport the assembled cart to painting booth, inspect the integrity of primer. After that paint the finish
Debugging
Debugging the cart after painting the finish with electric control system, after the debugging, the cart will test without load. And after the no load test, the cart will be tested with load. After the inspection, the cart will be transported to storage area.
Our Company and Our Team
Our Certificates and Service
If you have any question please feel free to contact us .